• 9964432222
  • Mail Us
  • Appointment
  • Locate Us
  • Chat Now
  • Courses
  • Login
  • Register
Manifest IAS
JournalsOfIndia
Advertisement
  • Home
  • SNIPPETSfor Prelims
  • ARTICLESfor Mains
  • BROWSEBY SOURCE
  • DOWNLOADS
No Result
View All Result
  • Home
  • SNIPPETSfor Prelims
  • ARTICLESfor Mains
  • BROWSEBY SOURCE
  • DOWNLOADS
No Result
View All Result
JournalsOfIndia
No Result
View All Result
Home Places in News

Chenab Railway Bridge and Other Projects Under PMDP

August 3, 2020
in Places in News
Reading Time: 3 mins read
0
Chenab Railway Bridge and Other Projects Under PMDP
103
VIEWS
Share on WhatsAppShare on TelegramShare on Facebook
image_pdfMake PDF

The world’s highest railway bridge over river Chenab in Jammu and Kashmir will be ready by next year, and will connect the valley with the rest of India by train for the first time by 2022.

Chenab Bridge

The bridge, which has a central span of 467 metres, is being built at a height of 359 metres from the bed level. The height of Qutub Minar in Delhi is 72 metres and that of the Eiffel Tower in Paris is 324 metres. This is the tallest railway bridge in the world and the maximum design wind speed for the bridge is 266 kmph.

The construction work of the bridge was accelerated in the last one year under the direct supervision of the top echelons of the central government. According to the plans, Kashmir will be connected by train by December 2022. The Udhampur-Katra (25 Km) section, Banihal-Qazigund (18 Km) section and Qazigund-Baramulla (118Km) section have already been commissioned.

The last remaining section, the 111 km Katra-Banihal section is currently under execution. It is targeted for completion in December 2022. The 126 km out of 174 km of tunnels on this section has already been completed. There has been a greater push in the last one year for implementation of various projects under the ₹80,068 crore Prime Minister’s Development Package (PMDP) announced in 2015.

PMDP

The package is meant for strengthening socio-economic infrastructure and balanced regional development of Jammu and Kashmir. The programme touches practically every sector and provides for massive investments in basic infrastructure. After the reorganisation of Jammu and Kashmir in August 2019, the Union Territory of Jammu and Kashmir was left with 54 projects under the PMDP with an outlay of ₹58,627 crore. A total of nine projects with an outlay of ₹21,441 crore were transferred to the UT of Ladakh.  

The work in the PMDP since June 2018 and particularly in the last one year has been rapid and unprecedented. The expenditure on various projects, which was 27% of the sanctioned cost in June 2018, has shot up to 54% in July 2020. The number of completed projects and substantially completed projects has correspondingly shot up from seven in June 2018 to 17 in July 2020. 

Projects under PMDP:

  • The Rambagh flyover in Srinagar was opened for traffic after a delay of over five years.
  • The IIT Jammu has started functioning from its own campus and over 2 lakh sq ft area was newly created for it.
  • The Srinagar Leh power transmission line and 220 KV Srinagar-Alusteng-Drass-Kargil–Leh power transmission system have also been completed.
  • Construction work of AIIMS in Jammu has started. Two years ago, the land for the project had not been handed over and the project was stuck up for want of land and other clearances.
  • The semi ring road in Jammu will be completed by next year and all land acquisition and related hurdles have been removed.In this project, 30% of the work has already been completed.
  • The 8.45 km new Banihal tunnel will be opened by next year as 86% of the work is completed.
  • Work on major roads like Jammu–Akhnoor Road, Chenani-Sudhmahadev Road has been accelerated.
  • Despite having 20,000 MW hydropower potential, Jammu and Kashmir had been able to tap only 3,500 MW in 70 years. In the last two years alone, about 3,000 MW capacity projects were revived and put on track. Work on 1,000 MW Pakal Dul and 624 MW Kiru started and two more projects — 800 MW Ratle and 540 MW Kwar have been put on fast track.
image_pdfMake PDF
Source: Financial Express & Live Mint
Tags: Prelims

Related Posts

Pangong Lake

Pangong Lake

May 21, 2022
Koilastila Gas field

Koilastila Gas field

May 4, 2022

Transnistria

May 4, 2022
Kuril islands

Kuril islands

April 25, 2022
Whakaari / White Island

Whakaari / White Island

April 22, 2022
East Timor

East Timor

April 21, 2022
Gaza strip

Gaza strip

April 20, 2022
Pradhanmantri Sangrahalaya

Pradhanmantri Sangrahalaya

April 14, 2022
India’s first-ever steel road

India’s first-ever steel road

April 2, 2022
Amarnath yatra, 2022

Amarnath yatra, 2022

March 30, 2022
Please login to join discussion

Our Offline Classroom Student

PRELIMS 2021 POLITY QUESTIONS ANALYSED

https://youtu.be/5q8hBcRGhAs

PRELIMS 2021 HISTORY QUESTIONS ANALYSED

https://youtu.be/v0SIZ7SUybg

CONGRATULATIONS TO 2020 TOPPERS !!!

Rank 25 Vaibhav Rawat 

Rank 218 Kankanala Rahul Reddy
Rank 385 Sagar A Wadi
Rank 504 Malashree MV
Rank 573 Shridevi B V
Rank 707 Mamatha G

COURSES OFFERED

PRELIMS SURESHOTS

May 2022
MTWTFSS
 1
2345678
9101112131415
16171819202122
23242526272829
3031 
« Apr    

Browse by Category

  • Agriculture
  • Disaster Management
  • Economy
  • Environment
  • Ethics
  • Foreign Affairs
  • Geography
  • Governance
  • History
  • Law & Policy
  • Opinion
  • People in News
  • Places in News
  • Science & Tech
  • Security
  • Society
  • Sports
  • Uncategorized

Browse by Tags

AIR BBC Business Standard CNN Deccan Herald DownToEarth Down to Earth DTE Economic Times ET GS-1 GS-2 GS-3 GS-4 Hindustan Times IE India & the world Indian express India today Indiatoday Kurukshetra LiveMint Mains News News Paper Newspaper PIB PIB & The Hindu pre Prelims PRS India RSTV Science Reporter Survey The Hindu The Hindustan Times The India Express The Indian Express The New Indian Express Times of India TOI TOPPERS UNDP website Wikipedia Yojana
JournalsOfIndia

Our vision is to orient the readers to grasp the facts objectively and analyse critically. In the rush of reaching first to the readers, the websites miss the balanced opinion, which is the need of the hour. We aim to reach the readers with more crispness, preciseness and relevance. We bring the articles in UPSC way for the civil services aspirants and the Wisest Way for general readers.

Categories

  • Agriculture
  • Disaster Management
  • Economy
  • Environment
  • Ethics
  • Foreign Affairs
  • Geography
  • Governance
  • History
  • Law & Policy
  • Opinion
  • People in News
  • Places in News
  • Science & Tech
  • Security
  • Society
  • Sports
  • Uncategorized

Browse by Tag

AIR BBC Business Standard CNN Deccan Herald DownToEarth Down to Earth DTE Economic Times ET GS-1 GS-2 GS-3 GS-4 Hindustan Times IE India & the world Indian express India today Indiatoday Kurukshetra LiveMint Mains News News Paper Newspaper PIB PIB & The Hindu pre Prelims PRS India RSTV Science Reporter Survey The Hindu The Hindustan Times The India Express The Indian Express The New Indian Express Times of India TOI TOPPERS UNDP website Wikipedia Yojana

Newsletter

The most important UPSC news and events of the day.

Get Journals daily newsletter on your inbox.

© 2020 JournalsOfIndia - A free initiative by Manifest Team.

  • Login
  • Sign Up
  • Home
  • SNIPPETS
  • ARTICLES
  • BROWSE
  • DOWNLOADS
No Result
View All Result

© 2020 JournalsOfIndia - A free initiative by Manifest Team.

Welcome Back!

Login to your account below

Forgotten Password? Sign Up

Create New Account!

Fill the forms bellow to register

All fields are required. Log In

Retrieve your password

Please enter your username or email address to reset your password.

Log In